WCRP CHFP IRI ECHAM4p5-MOM3-DC2 ATM hus leadtime: lead time data

IRI ECHAM4p5-MOM3-DC2 ATM hus lead time from WCRP CHFP: Climate-system Historical Forecast Project.

Independent Variables (Grids)

time
grid: /time (unitless) ordered (1.0) to (2688.0) by 1.0 N= 2688 pts :grid

Other Info

calendar
360
CE
null
CS
null
datatype
realarraytype
gridid
171146816
pointwidth
1
standard_name
forecast_period
units
months since 1960-01-01
standard units*
0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )

References

Roeckner, E., and Coauthors, 1996: The atmospheric general circulation model ECHAM4: Model description and simulation of present-day climate. Max-Planck-Institut fur Meteorologie Rep. 218, Hamburg, Germany, 90 pp.

Danabasoglu, G., W. G. Large, J.J. Tribbia, P. R. Gent, and B. P. Briegleb, 2006: Diurnal coupling in the tropical oceans of CCSM3. J. Climate, 19, 2347-2365.

Derber, J., A. Rosati. A global oceanic data assimilation system.. J. Phys. Oceanogr. 19, 1989

DeWitt, D. G., 2005:Retrospective forecasts of interannual sea surface temperature anomalies from 1982 to present using a directly coupled atmosphere-ocean general circulation model. Mon. Wea. Rev., 133, 2972-2995.

Luo, J.-J., S. Masson, E. Roeckner, G. Madec, and T. Yamagata, 2005: Reducing climatology bias in an ocean-atmosphere CGCM with improved coupling physics. J. Climate, 18, 2344--2360.

Pacanowski, R. C., and S. M. Griffies, 1998: MOM 3.0 manual. NOAA/Geophysical Fluid Dynamics Laboratory, Princeton, NJ, 608pp.

Last updated: Wed, 13 Feb 2019 20:27:28 GMT

Data Views

time
[ time |]M