ECMWF S2S CMA BCC-CPS-S2Sv2 reforecast control pressure_level_1 q: Specific Humidity data

reforecast control pressure_level_1 Specific Humidity from ECMWF S2S CMA BCC-CPS-S2Sv2: Beijing Climate Center (BCC) Climate Prediction System version 2 for S2S.

Independent Variables (Grids)

Lead (forecast_period)
grid: /L (days) ordered (0.0 days) to (60.0 days) by 1.0 N= 61 pts :grid
Pressure Level (air_pressure)
grid: /P2 (hPa) ordered [ (200) (300) (500) (700) (850) (925) (1000)] :grid
forecast start time (forecast_reference_time)
grid: /S (days since 1960-01-01) ordered (0000 11 Nov 2004) to (0000 9 Nov 2019) by 1.0 N= 5477 pts :grid
longitude (longitude)
grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
latitude (latitude)
grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid

Other Info

bufferwordsize
4
datatype
realarraytype
gribPDSpattern
04XXXX003C0100
missing_value
9.99900026E20
pointwidth
0.0
standard_name
specific_humidity
units
kg /kg
standard units*

Last updated: Tue, 29 Aug 2023 13:34:15 GMT

Data Views

LP2SXY
[ X Y | P2 L S]MMMMM