Lead (forecast_period) | grid: /LA (days) ordered (0.5 days) to (59.5 days) by 1.0 N= 60 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (3) by 1.0 N= 3 pts :grid
|
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered (0000 10 Jan 1994) to (0000 31 Dec 2014) by 1.0 N= 7661 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 2.506993 N= 144 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 2.5 N= 73 pts :grid
|