Lead (forecast_period) | grid: /L (days) ordered (0.0 days) to (61.0 days) by 1.0 N= 62 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (14) by 1.0 N= 14 pts :grid
|
Pressure Level (air_pressure) | grid: /P (hPa) ordered [ (10) (50) (100) (200) (300) (500) (700) (850) (925) (1000)] :grid
|
S | grid: /S (days since 1960-01-01) ordered [ (0000 1 Jan 1993) (0000 15 Jan 1993) (0000 1 Feb 1993) ... (0000 15 Dec 2014)] N= 528 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid
|