ECMWF S2S ECCC forecast perturbed sfc_runoff sro: Accumulated Surface Water Runoff data
forecast perturbed sfc_runoff Accumulated Surface Water Runoff from ECMWF S2S ECCC: ECCC Ensemble Prediction System.
Independent Variables (Grids)
- Lead (forecast_period)
- grid: /L1 (days) ordered (1.0 days) to (32.0 days) by 1.0 N= 32 pts :grid
- Ensemble Member (realization)
- grid: /M (ids) ordered (1) to (20) by 1.0 N= 20 pts :grid
- forecast start time (forecast_reference_time)
- grid: /S (days since 1960-01-01) ordered (0000 7 Jan 2016) to (0000 4 Apr 2024) by 7.0 N= 431 pts :grid
- longitude (longitude)
- grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
- latitude (latitude)
- grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid
Other Info
- bufferwordsize
- 4
- datatype
- realarraytype
- gribPDSpattern
- 04XXXX000B0022
- missing_value
- 9.99900026E20
- pointwidth
- 0.0
- standard_name
- runoff_amount_excluding_baseflow
- units
- kg m-2
- standard units*
- kilogram meter-2
Last updated: Fri, 26 Apr 2024 07:19:31 GMT