hdate | grid: /hdate (months since 1960-01-01) ordered (1995) to (2021) by 12.0 N= 27 pts :grid
|
Lead (forecast_period) | grid: /L (days) ordered (0.0 days) to (46.0 days) by 1.0 N= 47 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (10) by 1.0 N= 10 pts :grid
|
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered [ (0000 14 May 2015) (0000 18 May 2015) (0000 21 May 2015) ... (0000 29 Dec 2022)] N= 796 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid
|