ECMWF S2S EI reanalysis RMMS phase: phase data

reanalysis RMMS phase from ECMWF S2S EI: Era Interim Reanalysis.

Independent Variables (Grids)

Time (time)
grid: /T (days since 1960-01-01) ordered (1 Jan 1981) to (31 Dec 2016) by 1.0 N= 13149 pts :grid

Other Info

missing_value
9
units
unitless

Last updated: Fri, 09 Sep 2022 16:36:09 GMT

Data Views

T
[ T |]M


Filters

Here are some filters that are useful for manipulating data. There are actually many more available, but they have to be entered manually. See Ingrid Function Documentation for more information. Average over T |
RMS (root mean square with mean *not* removed) over T |
RMSA (root mean square with mean removed) over T |
Maximum over T |
Minimum over T |
Detrend (best-fit-line) over T |
Convert units from unitless to

Note on units