Lead (forecast_period) | grid: /L (days) ordered (0.0 days) to (61.0 days) by 1.0 N= 62 pts :grid
|
Pressure Level (air_pressure) | grid: /P (hPa) ordered [ (50) (100) (200) (300) (500) (700) (850) (925) (1000)] :grid
|
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered [ (0000 7 Jan 2015) (0000 14 Jan 2015) (0000 21 Jan 2015) ... (0000 28 Mar 2024)] N= 482 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 2.506993 N= 144 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 2.5 N= 73 pts :grid
|