Lead (forecast_period) | grid: /L (days) ordered (0.0 days) to (61.0 days) by 1.0 N= 62 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (19) by 1.0 N= 19 pts :grid
|
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered [ (0000 7 Jan 2015) (0000 14 Jan 2015) (0000 21 Jan 2015) ... (0000 28 Mar 2024)] N= 482 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 2.506993 N= 144 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 2.5 N= 73 pts :grid
|