Lead (forecast_period) | grid: /L (days) ordered (0.0 days) to (31.0 days) by 1.0 N= 32 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (40) by 1.0 N= 40 pts :grid
|
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered (0000 9 Nov 2015) to (0000 10 Aug 2023) by 1.0 N= 2832 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 2.506993 N= 144 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 2.5 N= 73 pts :grid
|