outline | an outline showing all sub-datasets and variables contained in this dataset |
Lead (forecast_period) | grid: /L (days) ordered (1.5 days) to (33.5 days) by 1.0 N= 33 pts :grid |
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered (0000 10 Jan 1981) to (0000 31 Dec 2012) by 1.0 N= 11679 pts :grid |
Last updated: Fri, 09 Sep 2022 16:36:09 GMT