ECMWF S2S JMA reforecast RMMS ensemble_mean phase: phase data
reforecast RMMS ensemble_mean phase from ECMWF S2S JMA: JMA Ensemble System.
Independent Variables (Grids)
- Lead (forecast_period)
- grid: /L (days) ordered (1.5 days) to (33.5 days) by 1.0 N= 33 pts :grid
- forecast start time (forecast_reference_time)
- grid: /S (days since 1960-01-01) ordered (0000 10 Jan 1981) to (0000 31 Dec 2012) by 1.0 N= 11679 pts :grid
Other Info
- datatype
- realarraytype
- units
- unitless
- standard units*
- unitless
Last updated: Fri, 09 Sep 2022 16:36:42 GMT