Lead (forecast_period) | grid: /LA (days) ordered (0.5 days) to (43.5 days) by 1.0 N= 44 pts :grid
|
Lead (forecast_period) | grid: /LB (days) ordered (1.5 days) to (43.5 days) by 1.0 N= 43 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (15) by 1.0 N= 15 pts :grid
|
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered (0000 1 Jan 2015) to (0000 27 Mar 2024) by 1.0 N= 3374 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid
|