hdate | grid: /hdate (months since 1960-01-01) ordered (1993) to (2015) by 12.0 N= 23 pts :grid
|
Lead (forecast_period) | grid: /LA (days) ordered (0.5 days) to (59.5 days) by 1.0 N= 60 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (2) N= 2 pts :grid
|
S | grid: /S (days since 1960-01-01) ordered [ (0000 1 Jan 2016) (0000 9 Jan 2016) (0000 17 Jan 2016) ... (0000 9 May 2019)] N= 162 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid
|