hdate | grid: /hdate (months since 1960-01-01) ordered (1993) to (2015) by 12.0 N= 23 pts :grid
|
Lead (forecast_period) | grid: /L (days) ordered (0.0 days) to (60.0 days) by 1.0 N= 61 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (6) by 1.0 N= 6 pts :grid
|
S | grid: /S (days since 1960-01-01) ordered [ (0000 25 Mar 2017) (0000 1 Apr 2017) (0000 9 Apr 2017) ... (0000 9 May 2024)] N= 343 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid
|