INMET Forecast CPT target_date: forecast time data

Forecast CPT forecast time from INMET: Instituto Nacional de Meteorologia do Brasil.

Independent Variables (Grids)

Forecast Lead Time in Months
grid: /L (months) ordered (0.5 months) to (2.5 months) by 1.0 N= 3 pts :grid
Forecast Start Time
grid: /S (months since 1960-01-01) ordered (0000 1 Aug 2012) to (0000 1 Sep 2012) N= 2 pts :grid

Other Info

calendar
360
CE
null
CS
null
datatype
realarraytype
gridid
185222192
pointwidth
1
scale_max
null
scale_min
null
units
months since 1960-01-01
standard units*
0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )

Last updated: Mon, 16 Feb 2015 21:51:22 GMT

Data Views

LS
[ S L |]MM


Filters

Here are some filters that are useful for manipulating data. There are actually many more available, but they have to be entered manually. See Ingrid Function Documentation for more information. Average over S L | S L |
RMS (root mean square with mean *not* removed) over S L | S L |
RMSA (root mean square with mean removed) over S L | S L |
Maximum over S L | S L |
Minimum over S L | S L |
Detrend (best-fit-line) over S L | S L |
Convert units from months since 1960-01-01 to

Note on units