T Time from IRI Analyses ICPAC Models Montreal CMC2-CanCM4 FORECAST MONTHLY orig: original entry.
Independent Variables (Grids)
- L (forecast_period)
- grid: /L (months) ordered (1.0 months) to (11.0 months) by 1.0 N= 11 pts :grid
- Forecast Start Time (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Dec 2011) to (0000 1 Nov 2015) by 1.0 N= 48 pts :grid
Other Info
- calendar
- 360
- CE
- null
- CS
- null
- datatype
- realarraytype
- gridid
- 195793280
- pointwidth
- 1.0
- scale_max
- null
- scale_min
- null
- standard_name
- time
- units
- months
- standard units*
- 0.0833333333333333 year
References
Kirtman, Ben P., and Coauthors, 2014: The North American Multimodel Ensemble: Phase-1 seasonal-to-interannual prediction; Phase-2 toward developing intraseasonal prediction. Bull. Amer. Meteor. Soc., 95, 585–601. doi: http://dx.doi.org/10.1175/BAMS-D-12-00050.1
Last updated: Tue, 08 Dec 2020 21:55:17 GMT