Last updated: Tue, 08 Dec 2020 21:55:17 GMT
L | M | S | X | Y | |
$partialdiff sub S$ [ IRI Analyses ICPAC Models Montreal CMC2-CanCM4 FORECAST MONTHLY tref ][ X Y | L M S] | M | O=-0.5 | M | M | M |
---|---|---|---|---|---|
grid: /Y (degree_north) ordered (90S) to (90N) by 1.0 N= 181 pts :grid | M | ||||
grid: /L (months) ordered (1.0 months) to (11.0 months) by 1.0 N= 11 pts :grid | M | ||||
$integral dM$ M[ M |] | M |