IRI Analyses ICPAC Models Montreal GEM-NEMO FORECAST MONTHLY T: Time data

Analyses ICPAC Models Montreal GEM-NEMO FORECAST MONTHLY Time from IRI: International Research Institute for Climate and Society.

Independent Variables (Grids)

Lead
grid: /L (months) ordered (0.5 months) to (11.5 months) by 1.0 N= 12 pts :grid
Forecast Start Time (forecast_reference_time)
grid: /S (months since 1960-01-01) ordered (0000 1 Aug 2019) to (0000 1 Aug 2020) by 1.0 N= 13 pts :grid

Other Info

calendar
360
CE
null
CS
null
datatype
realarraytype
defaultvalue
727.0
gridid
164911456
pointwidth
1.0
scale_max
null
scale_min
null
standard_name
time
units
months since 1960-01-01
standard units*
0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )

References

Kirtman, Ben P., and Coauthors, 2014: The North American Multimodel Ensemble: Phase-1 seasonal-to-interannual prediction; Phase-2 toward developing intraseasonal prediction. Bull. Amer. Meteor. Soc., 95, 585–601. doi: http://dx.doi.org/10.1175/BAMS-D-12-00050.1

Last updated: Fri, 31 Jul 2020 17:18:20 GMT
Expires: Tue, 01 Sep 2020 07:00:00 GMT

Data Views

LS
[ S L |]MM


Filters

Here are some filters that are useful for manipulating data. There are actually many more available, but they have to be entered manually. See Ingrid Function Documentation for more information. Average over S L | S L |
RMS (root mean square with mean *not* removed) over S L | S L |
RMSA (root mean square with mean removed) over S L | S L |
Maximum over S L | S L |
Minimum over S L | S L |
Detrend (best-fit-line) over S L | S L |
Convert units from months since 1960-01-01 to

Note on units