IRI FD CPT Indonesia APHR_obs Forecast PredErrorVars: prediction error variance data
prediction error variance from IRI FD CPT Indonesia APHR_obs Forecast: Forecast and Error.
Independent Variables (Grids)
- Forecast Lead Time in Months
- grid: /L (months) ordered (2.5 months) to (5.5 months) by 1.0 N= 4 pts :grid
- Forecast Issue Date (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Oct 2012) to (0000 1 Oct 2017) by 1.0 N= 61 pts :grid
- Longitude (longitude)
- grid: /X (degree_east) ordered (90.125E) to (149.875E) by 0.25 N= 240 pts :grid
- Latitude (latitude)
- grid: /Y (degree_north) ordered (13.375N) to (9.875S) by 0.25 N= 94 pts :grid
Other Info
- bufferwordsize
- 4
- datatype
- realarraytype
- missing_value
- -999.0
- pointwidth
- 0
- scale_min
- 0.0
- units
- mm /day
- standard units*
- 1.15740740740741×10-08 meter second-1
Last updated: Fri, 11 Jun 2021 17:23:22 GMT
Expires: Fri, 09 Jul 2021 00:00:00 GMT