IRI FD CPT Indonesia InputObs: input observations data

Indonesia input observations from IRI FD CPT: Climate Prediction Tool.

Independent Variables (Grids)

Forecast Lead Time in Months
grid: /L (months) ordered (2.5 months) to (5.5 months) by 1.0 N= 4 pts :grid
Time (time)
grid: /T (months since 01-Jan) periodic (Jan) to (Dec) by 1.0 N= 12 pts :grid
Training period
grid: /T2 (months since 1960-01-01) ordered (1982) to (2006) by 12.0 N= 25 pts :grid
Longitude (longitude)
grid: /X (degree_east) ordered (90.25E) to (164.75E) by 0.5 N= 150 pts :grid
Latitude (latitude)
grid: /Y (degree_north) ordered (13.25N) to (9.75S) by 0.5 N= 47 pts :grid

Other Info

bufferwordsize
4
CE
16
colorscalename
precip_colors
CS
0
datatype
realarraytype
maxncolor
254
missing_value
-999.0
pointwidth
1.0
scale_max
16.0
scale_min
0.0
units
mm /month
standard units*
0.012 meter year-1
colorscale

Last updated: Fri, 11 Jun 2021 17:23:01 GMT

Data Views

LTT2XY
[ X Y T2 | T L]MMMMM