IRI FD CPT Indonesia PredErrorVars: prediction error variance data
Indonesia prediction error variance from IRI FD CPT: Climate Prediction Tool.
Independent Variables (Grids)
- Forecast Lead Time in Months
- grid: /L (months) ordered (2.5 months) to (5.5 months) by 1.0 N= 4 pts :grid
- Start time (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Jun 2010) to (0000 1 Sep 2012) by 1.0 N= 28 pts :grid
- Longitude (longitude)
- grid: /X (degree_east) ordered (90.25E) to (164.75E) by 0.5 N= 150 pts :grid
- Latitude (latitude)
- grid: /Y (degree_north) ordered (13.25N) to (9.75S) by 0.5 N= 47 pts :grid
Other Info
- bufferwordsize
- 4
- datatype
- realarraytype
- missing_value
- -999.0
- pointwidth
- 0
- scale_min
- 0.0
- units
- mm /month
- standard units*
- 0.012 meter year-1
Last updated: Fri, 11 Jun 2021 17:23:01 GMT
Expires: Fri, 09 Jul 2021 00:00:00 GMT