IRI FD CPT Indonesia PredErrorVars: prediction error variance data

Indonesia prediction error variance from IRI FD CPT: Climate Prediction Tool.

Independent Variables (Grids)

Forecast Lead Time in Months
grid: /L (months) ordered (2.5 months) to (5.5 months) by 1.0 N= 4 pts :grid
Start time (forecast_reference_time)
grid: /S (months since 1960-01-01) ordered (0000 1 Jun 2010) to (0000 1 Sep 2012) by 1.0 N= 28 pts :grid
Longitude (longitude)
grid: /X (degree_east) ordered (90.25E) to (164.75E) by 0.5 N= 150 pts :grid
Latitude (latitude)
grid: /Y (degree_north) ordered (13.25N) to (9.75S) by 0.5 N= 47 pts :grid

Other Info

bufferwordsize
4
datatype
realarraytype
missing_value
-999.0
pointwidth
0
scale_min
0.0
units
mm /month
standard units*
0.012 meter year-1

Last updated: Fri, 11 Jun 2021 17:23:01 GMT
Expires: Fri, 09 Jul 2021 00:00:00 GMT

Data Views

LSXY
[ X Y | S L]MMMM