$partialdiff sub S$ $integral dS$ [ IRI FD CPT Indonesia target_date ]
S | grid: /S (months since 1960-01-01) ordered (16 May 2010 - 15 Jun 2010) to (16 Aug 2012 - 15 Sep 2012) by 1.0 N= 28 pts :grid |
---|---|
L | grid: /L (months) ordered (3.0 months) to (5.0 months) by 1.0 N= 3 pts :grid |