IRI FD CPT NEBrazil PredErrorVars: prediction error variance data

NEBrazil prediction error variance from IRI FD CPT: Climate Prediction Tool.

Independent Variables (Grids)

Forecast Lead Time in Months
grid: /L (months) ordered (2.5 months) to (5.5 months) by 1.0 N= 4 pts :grid
Start time (forecast_reference_time)
grid: /S (months since 1960-01-01) ordered (0000 1 Jan 2009) to (0000 1 Mar 2017) by 1.0 N= 99 pts :grid
Longitude (longitude)
grid: /X (degree_east) ordered (41.75W) to (36.25W) by 0.5 N= 12 pts :grid
Latitude (latitude)
grid: /Y (degree_north) ordered (3.25S) to (9.75S) by 0.5 N= 14 pts :grid

Other Info

bufferwordsize
4
datatype
realarraytype
missing_value
-999.0
pointwidth
0
scale_min
0.0
units
mm /month
standard units*
0.012 meter year-1
history
Output from CPT for 12 3-month running seasons for 1973-2001 between ECHAM4p5 GCM and CRU dataset, CPT recompiled on Mac 9.04 version

Last updated: Fri, 11 Jun 2021 17:23:44 GMT
Expires: Fri, 09 Jul 2021 00:00:00 GMT

Data Views

LSXY
[ X Y | S L]MMMM