IRI FD CPT NEBrazil

NEBrazil from IRI FD CPT: Climate Prediction Tool.

Documents

outlinean outline showing all sub-datasets and variables contained in this dataset

Datasets and variables

IRI FD CPT NEBrazil CrossValHind[ X Y T2 | T L]
IRI FD CPT NEBrazil Forecast[ X Y | S L]
IRI FD CPT NEBrazil hindcast_date[ T2 T L |]
IRI FD CPT NEBrazil InputObs[ X Y T2 | T L]
IRI FD CPT NEBrazil PearsonR[ X Y | T L]
IRI FD CPT NEBrazil PredErrorVars[ X Y | S L]
IRI FD CPT NEBrazil target_date[ L S |]

Independent Variables (Grids)

Forecast Lead Time in Months grid: /L (months) ordered (2.5 months) to (5.5 months) by 1.0 N= 4 pts :grid
Start time (forecast_reference_time) grid: /S (months since 1960-01-01) ordered (0000 1 Jan 2009) to (0000 1 Mar 2017) by 1.0 N= 99 pts :grid
Time (time) grid: /T (months since 01-Jan) periodic (Jan) to (Dec) by 1.0 N= 12 pts :grid
Training period grid: /T2 (months since 1960-01-01) ordered (1973) to (2001) by 12.0 N= 29 pts :grid
Longitude (longitude) grid: /X (degree_east) ordered (41.75W) to (36.25W) by 0.5 N= 12 pts :grid
Latitude (latitude) grid: /Y (degree_north) ordered (3.25S) to (9.75S) by 0.5 N= 14 pts :grid
history
Output from CPT for 12 3-month running seasons for 1973-2001 between ECHAM4p5 GCM and CRU dataset, CPT recompiled on Mac 9.04 version

Last updated: Fri, 11 Jun 2021 17:23:44 GMT
Expires: Fri, 09 Jul 2021 00:00:00 GMT

Data Views

IRI FD CPT NEBrazil[ ]