Forecast asst monthly Forecast Time from IRI FD GCM ECHAM4p5: ECHAM4.5 ensemble forecasts and simulations.
Independent Variables (Grids)
- L (forecast_period)
- grid: /L (months) ordered (0.5 months) to (6.5 months) by 1.0 N= 7 pts :grid
- Forecast Started (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Sep 2001) to (0000 1 May 2004) by 1.0 N= 33 pts :grid
Other Info
- calendar
- 360
- CE
- null
- CS
- null
- datatype
- realarraytype
- gridid
- 171148736
- pointwidth
- 1
- scale_max
- null
- scale_min
- null
- standard_name
- time
- units
- months since 1960-01-01
- standard units*
- 0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )
References
Roeckner, E., and Coauthors, 1996: The atmospheric general circulation model ECHAM4: Model description and simulation of present-day climate. Max-Planck-Institut fur Meteorologie Rep. 218, Hamburg, Germany, 90 pp.
Last updated: Tue, 26 Apr 2022 18:31:26 GMT