IRI FD NMME_Seasonal_Forecast ELR_coeffs_IMD fcstmean precip: Ensemble Mean Precipitation data
Ensemble Mean Precipitation from IRI FD NMME_Seasonal_Forecast ELR_coeffs_IMD fcstmean: Forecast Ensemble Mean.
Independent Variables (Grids)
- Lead Time
- grid: /L (months) ordered (2.5 months) to (5.5 months) by 1.0 N= 4 pts :grid
- Models
- grid: /modl (unitless) ordered (1.0) to (8.0) by 1.0 N= 8 pts :grid
- Start Time
- grid: /S (months since 1960-01-01) ordered (0000 1 Nov 2017) to (0000 1 Jul 2018) by 1.0 N= 9 pts :grid
- Longitude (longitude)
- grid: /X (degree_east) ordered (66.5E) to (100.5E) by 1.0 N= 35 pts :grid
- Latitude (latitude)
- grid: /Y (degree_north) ordered (6.5N) to (38.5N) by 1.0 N= 33 pts :grid
Other Info
- CE
- null
- colorscalename
- precip_colors
- CS
- 0
- datatype
- doublearraytype
- maxncolor
- 254
- missing_value
- NaN
- pointwidth
- 0.0
- scale_min
- 0.0
- units
- mm /day
- standard units*
- 1.15740740740741×10-08 meter second-1
Last updated: Tue, 23 Nov 2021 19:15:51 GMT