Accessing data using CPT (ingrid imposes a limit of 3999 points in the degrees-east grid)

You are downloading

IRI FD SubC ELR_Forecast precip ELR_coeffs CFSv2 target_date

Start Time grid: /S (days since 1960-01-01) ordered (0000 1 Nov 2019) to (0000 1 Aug 2025) by 7.0 N= 301 pts :grid
Lead Time grid: /L (days) ordered (15.0 days) to (22.0 days) N= 2 pts :grid

Get the data for

CPTv10+