IRI FD SubC ELR_Forecast precip precomputed probaNEcx15: Probability of non-exceeding 15th %-ile data
Probability of non-exceeding 15th %-ile from IRI FD SubC ELR_Forecast precip precomputed: pre-computed probabilistic forecasts.
Independent Variables (Grids)
- Lead Time
- grid: /L (days) ordered (15.0 days) to (22.0 days) N= 2 pts :grid
- Start Time
- grid: /S (days since 1960-01-01) ordered (0000 2 Oct 2020) to (0000 27 Jun 2025) by 7.0 N= 248 pts :grid
- Longitude (longitude)
- grid: /X (degree_east) periodic (0) to (1W) by 1.0 N= 360 pts :grid
- Latitude (latitude)
- grid: /Y (degree_north) ordered (89.5S) to (89.5N) by 1.0 N= 180 pts :grid
Other Info
- CE
- 1
- CS
- 0
- datatype
- realarraytype
- fnname
- eexp
- maxncolor
- 254
- missing_value
- NaN
- pointwidth
- 0.0
- scale_max
- 1.0
- scale_min
- 0.0
- units
- unitless
- colorscale
Last updated: Thu, 26 Jun 2025 13:33:02 GMT
Expires: Thu, 03 Jul 2025 00:00:00 GMT