IRI FD SubC ELR_Forecast t2m ELR_coeffs EMC

IRI FD SubC ELR_Forecast t2m ELR_coeffs EMC: Global Extended Logistic Regression SubC flexible Forecast. SubCEMC-GEFSv11 model stopped on Apr 30, 2021.

Documents

outlinean outline showing all sub-datasets and variables contained in this dataset

Datasets and variables

Forecast Ensemble Mean. SubCEMC-GEFSv11 model stopped on Apr 30, 2021.
ELR climatological coefficients. SubCEMGEFSv11 model stopped on Apr 30, 2021.
ELR forecast coefficients. SubCEMC-GEFSv11 model stopped on Apr 30, 2021.
IRI FD SubC ELR_Forecast t2m ELR_coeffs EMC target_date[ S L |]

Independent Variables (Grids)

Lead Time grid: /L (days) ordered (15.0 days) to (22.0 days) N= 2 pts :grid
Start Time grid: /S (days since 1960-01-01) ordered (0000 1 Nov 2019) to (0000 27 Jun 2025) by 7.0 N= 296 pts :grid

Last updated: Mon, 29 Jul 2024 14:17:19 GMT
Expires: Thu, 03 Jul 2025 00:00:00 GMT

Data Views

IRI FD SubC ELR_Forecast t2m ELR_coeffs EMC[ ]