Models SubC EMC GEFSv12_CPC forecast target_date: Forecast Period data
forecast Forecast Period from Models SubC EMC GEFSv12_CPC: current GEFSv12 issues served by CPC.
Independent Variables (Grids)
- Lead (forecast_period)
- grid: /L (days) ordered (1.5 days) to (34.5 days) by 1.0 N= 34 pts :grid
- Start Time (forecast_reference_time)
- grid: /S (days since 1960-01-01) ordered (0000 2 Apr 2022) to (0000 27 Jun 2025) by 1.0 N= 1183 pts :grid
Other Info
- calendar
- standard
- CE
- null
- CS
- null
- datatype
- realarraytype
- gridid
- 184844008
- pointwidth
- 1.0
- scale_max
- null
- scale_min
- null
- standard_name
- forecast_reference_time
- units
- days since 1960-01-01
- standard units*
- 86400 ( seconds since 1960-01-01 00:00.000 )
Last updated: Sat, 28 Jun 2025 14:05:02 GMT
Expires: Sun, 29 Jun 2025 00:00:00 GMT