WCRP CLIVAR ETCCDI CMIP5 historical CESM1-FASTCHEM v20120522

CESM1-FASTCHEM v20120522 from WCRP CLIVAR ETCCDI CMIP5 historical: historical experiment.

Documents

overviewan outline showing sub-datasets of this dataset

Datasets and variables

WCRP CLIVAR ETCCDI CMIP5 historical CESM1-FASTCHEM v20120522 annual[altcsdi fd r10mm r1mm altwsdi cdd rx5day sdii tn10p tn90p tx10p tnx tx90p altcwd txn txx id version wsdi tr tnn altcdd cwd r99p dtr prcptot rx1day gsl csdi r95p su r20mm ]
WCRP CLIVAR ETCCDI CMIP5 historical CESM1-FASTCHEM v20120522 monthly[tx10p txn tx90p time_bnds rx5day tn10thresh tn90thresh tn90p txx tnx version r95thresh tx90thresh tnn dtr rx1day r99thresh tn10p tx10thresh ]

References

Sillmann, J., V. V. Kharin, X. Zhang, F. W. Zwiers, and D. Bronaugh (2013), Climate extremes indices in the CMIP5 multimodel ensemble: Part 1. Model evaluation in the present climate, J. Geophys. Res. Atmos., 118, 1716-1733, doi:10.1002/jgrd.50203.

Sillmann, J., V. V. Kharin, F. W. Zwiers, X. Zhang, and D. Bronaugh (2013), Climate extremes indices in the CMIP5 multimodel ensemble: Part 2. Future climate projections, J. Geophys. Res. Atmos., 118, 2473-2493, doi:10.1002/jgrd.50188.

Last updated: Mon, 16 Feb 2015 21:51:22 GMT

WCRP CLIVAR ETCCDI CMIP5 historical CESM1-FASTCHEM v20120522[ ]