WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual

bcc-csm1-1-m v20120709 annual from WCRP CLIVAR ETCCDI CMIP5 historical: historical experiment.

Documents

outlinean outline showing all sub-datasets and variables contained in this dataset

Datasets and variables

WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual altcdd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual altcsdi 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual altcwd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual altwsdi 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual cdd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual csdi 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual cwd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual dtr 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual fd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual gsl 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual id 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual prcptot 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual r10mm 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual r1mm 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual r20mm 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual r95p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual r99p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual rx1day 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual rx5day 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual sdii 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual su 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual tn10p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual tn90p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual tnn 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual tnx 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual tr 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual tx10p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual tx90p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual txn 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual txx 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual version[ N |]
WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual wsdi 1[ lon lat | N M L time]

Independent Variables (Grids)

perturbed physics grid: /L (ids) ordered [ (1)] :grid
lat (latitude) grid: /lat (degree_north) ordered [ (89.14152S) (88.02943S) (86.91077S) ... (89.14152N)] N= 160 pts :grid
lon (longitude) grid: /lon (degree_east) periodic (0) to (1.125W) by 1.125 N= 320 pts :grid
initialization method grid: /M (ids) ordered [ (1)] :grid
realization grid: /N (ids) ordered (1) to (3) by 1.0 N= 3 pts :grid
time (time) grid: /time (months since 1960-01-01) ordered (1850) to (2012) by 12.0 N= 163 pts :grid

Other Info

BCC_contact
Dr. Tongwen Wu (twwu@cma.gov.cn)
branch_time
300.0
cmor_version
2.5.6
comment
The main difference between BCC-CSM1-1-M and BCC-CSM1-1 is their horizontal resolutions of the atmospheric component and the corresponding mask of sea-land. The experiment starts from piControl run at year 300. RCP8.5 scenario forcing data are used beyond year 2005.
contact
bronaugh@uvic.ca
Conventions
CF-1.4
creation_date
2013-06-27T22:55:20Z
ETCCDI_indices_archive
Please check http://www.cccma.ec.gc.ca/data/climdex/climdex.shtml for errata or updates.
ETCCDI_institution
Pacific Climate Impacts Consortium
ETCCDI_institution_id
PCIC
ETCCDI_software
climdex.pcic
ETCCDI_software_version
0.7.1
experiment
historical
experiment_id
historical
forcing
Nat Ant GHG SD Oz Sl Vl SS Ds BC OC
frequency
yr
initialization_method
1
input_creation_date
2012-03-15T08:43:42Z
input_frequency
day
input_title
bcc-csm1-1-m model output prepared for CMIP5 historical
input_tracking_id
5bbc1d61-36ef-4837-9f01-2e28c6797716
institute_id
BCC
institution
Beijing Climate Center(BCC),China Meteorological Administration,China
model_id
bcc-csm1-1-m
modeling_realm
atmos
nco_openmp_thread_number
1
parent_experiment
pre-industrial control
parent_experiment_id
piControl
physics_version
1
product
output
project_id
CMIP5
source
bcc-csm1-1-m:atmosphere: BCC_AGCM2.2 (T106L26); land: BCC_AVIM1.1;ocean: MOM4_L40v2 (tripolar, 1 lon x (1-1/3) lat, L40);sea ice: SIS (tripolar,1 lon x (1-1/3) lat)
table_id
Table day (11 April 2011) ec52f6ea2595168e5458ad1b950fd49c
title
ETCCDI indices computed on bcc-csm1-1-m model output prepared for CMIP5 historical

References

Sillmann, J., V. V. Kharin, X. Zhang, F. W. Zwiers, and D. Bronaugh (2013), Climate extremes indices in the CMIP5 multimodel ensemble: Part 1. Model evaluation in the present climate, J. Geophys. Res. Atmos., 118, 1716-1733, doi:10.1002/jgrd.50203.

Sillmann, J., V. V. Kharin, F. W. Zwiers, X. Zhang, and D. Bronaugh (2013), Climate extremes indices in the CMIP5 multimodel ensemble: Part 2. Future climate projections, J. Geophys. Res. Atmos., 118, 2473-2493, doi:10.1002/jgrd.50188.

Last updated: Mon, 16 Feb 2015 21:51:22 GMT

Data Views

WCRP CLIVAR ETCCDI CMIP5 historical bcc-csm1-1-m v20120709 annual[ ]