WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual

bcc-csm1-1-m v20120724 annual from WCRP CLIVAR ETCCDI CMIP5 rcp45: representative concentration pathway to radiative forcing of 4.5 W m-2.

Documents

outlinean outline showing all sub-datasets and variables contained in this dataset

Datasets and variables

WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual altcdd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual altcsdi 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual altcwd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual altwsdi 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual cdd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual csdi 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual cwd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual dtr 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual fd 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual gsl 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual id 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual prcptot 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual r10mm 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual r1mm 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual r20mm 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual r95p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual r99p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual rx1day 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual rx5day 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual sdii 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual su 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual tn10p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual tn90p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual tnn 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual tnx 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual tr 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual tx10p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual tx90p 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual txn 1[ lon lat | N M L time]
WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual txx 1[ lon lat | N M L time]

WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual wsdi 1[ lon lat | N M L time]

Independent Variables (Grids)

perturbed physics grid: /L (ids) ordered [ (1)] :grid
latitude (latitude) grid: /lat (degree_north) ordered [ (89.14152S) (88.02943S) (86.91077S) ... (89.14152N)] N= 160 pts :grid
longitude (longitude) grid: /lon (degree_east) periodic (0) to (1.125W) by 1.125 N= 320 pts :grid
initialization method grid: /M (ids) ordered [ (1)] :grid
realization (realization) grid: /N (ids) ordered [ (1)] :grid
time (time) grid: /time (months since 1960-01-01) ordered (2006) to (2100) by 12.0 N= 95 pts :grid

Other Info

BCC_contact
Dr. Tongwen Wu (twwu@cma.gov.cn)
branch_time
2006.0
cmor_version
2.5.6
comment
The main difference between BCC-CSM1-1-M and BCC-CSM1-1 is their horizontal resolutions of the atmospheric component and the corresponding mask of sea-land. Future projection (2006-2100) forced with prescribed concentration scenario of RCP4.5. The carbon cycle in land and ocean component model is considered, but the time-evolution of CO2 concentration in atmospheric component is prescribed.
contact
bronaugh@uvic.ca
Conventions
CF-1.4
creation_date
2013-06-29T21:18:04Z
ETCCDI_indices_archive
Please check http://www.cccma.ec.gc.ca/data/climdex/climdex.shtml for errata or updates.
ETCCDI_institution
Pacific Climate Impacts Consortium
ETCCDI_institution_id
PCIC
ETCCDI_software
climdex.pcic
ETCCDI_software_version
0.7.1
experiment
RCP4.5
experiment_id
rcp45
forcing
Nat Ant GHG SD Oz Sl SS Ds BC OC
frequency
yr
initialization_method
1
input_creation_date
2012-07-07T08:05:05Z
input_frequency
day
input_title
bcc-csm1-1-m model output prepared for CMIP5 RCP4.5
input_tracking_id
1cc20be4-015d-4d34-90c1-7395aaf328cc
institute_id
BCC
institution
Beijing Climate Center(BCC),China Meteorological Administration,China
model_id
bcc-csm1-1-m
modeling_realm
atmos
nco_openmp_thread_number
1
parent_experiment
historical
parent_experiment_id
historical
physics_version
1
product
output
project_id
CMIP5
source
bcc-csm1-1-m:atmosphere: BCC_AGCM2.2 (T106L26); land: BCC_AVIM1.1;ocean: MOM4_L40v2 (tripolar, 1 lon x (1-1/3) lat, L40);sea ice: SIS (tripolar,1 lon x (1-1/3) lat)
table_id
Table day (11 April 2011) ec52f6ea2595168e5458ad1b950fd49c
title
ETCCDI indices computed on bcc-csm1-1-m model output prepared for CMIP5 RCP4.5

References

Sillmann, J., V. V. Kharin, X. Zhang, F. W. Zwiers, and D. Bronaugh (2013), Climate extremes indices in the CMIP5 multimodel ensemble: Part 1. Model evaluation in the present climate, J. Geophys. Res. Atmos., 118, 1716-1733, doi:10.1002/jgrd.50203.

Sillmann, J., V. V. Kharin, F. W. Zwiers, X. Zhang, and D. Bronaugh (2013), Climate extremes indices in the CMIP5 multimodel ensemble: Part 2. Future climate projections, J. Geophys. Res. Atmos., 118, 2473-2493, doi:10.1002/jgrd.50188.

Last updated: Mon, 16 Feb 2015 21:51:22 GMT

Data Views

WCRP CLIVAR ETCCDI CMIP5 rcp45 bcc-csm1-1-m v20120724 annual[ ]