WCRP SMIP-2 forecast_SST RPN T: Forecast Time data

Forecast Time from WCRP SMIP-2 forecast_SST RPN: Canadian Meteorological Centre.

Independent Variables (Grids)

lead time (forecast_period)
grid: /L (months) ordered (0.5 months) to (3.5 months) by 1.0 N= 4 pts :grid
start time (forecast_reference_time)
grid: /S (months since 1960-01-01) ordered (0000 1 Mar 1969) to (0000 1 Dec 2000) by 3.0 N= 128 pts :grid

Other Info

calendar
360
CE
null
CS
null
datatype
realarraytype
gridid
163380176
pointwidth
1
scale_max
null
scale_min
null
standard_name
time
units
months since 1960-01-01
standard units*
0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )

References

Côté, J., S. Gravel, A. Méthot, A. Patoine, M. Roch and A. Staniforth, 1998: The Operational CMC-MRB Global Environmental Multiscale (GEM) Model Part I - Design Considerations and Formulation, Mon Wea. Rev., 126, 1373-1395.

Côté, J., J.-G. Desmarais, S. Gravel, A. Méthot, A. Patoine, M. Roch and A. Staniforth, 1998: The Operational CMC-MRB Global Environmental Multiscale (GEM) Model: Part II - Results, Mon. Wea. Rev. 126, 1397-1418.

Last updated: Fri, 18 Sep 2015 18:39:07 GMT

Data Views

LS
[ S L |]MM