MONTHLY Forecast Time from Models NMME NCEP-CFSv2 FORECAST EARLY_MONTH_SAMPLES: Four times daily realtime forecasts sampled from last day of previous month and first 7 days of current month, organized as monthly starts (S) of 32 members (M), starting from March 2011.
Independent Variables (Grids)
- L
- grid: /L (months) ordered (0.5 months) to (9.5 months) by 1.0 N= 10 pts :grid
- S (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Mar 2011) to (0000 1 Jul 2025) by 1.0 N= 173 pts :grid
Other Info
- bufferwordsize
- 4
- calendar
- 360
- CE
- null
- CS
- null
- datatype
- realarraytype
- pointwidth
- 1
- standard_name
- time
- units
- months since 1960-01-01
- standard units*
- 0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )
References
Kirtman, Ben P., and Coauthors, 2014: The North American Multimodel Ensemble: Phase-1 seasonal-to-interannual prediction; Phase-2 toward developing intraseasonal prediction. Bull. Amer. Meteor. Soc., 95, 585–601. doi: http://dx.doi.org/10.1175/BAMS-D-12-00050.1
Last updated: Wed, 18 Jan 2023 20:34:04 GMT