ECMWF S2S CMA BCC-CPS-S2Sv2 forecast perturbed sfc_precip tp: Accumulated Total Precipitation data

forecast perturbed sfc_precip Accumulated Total Precipitation from ECMWF S2S CMA BCC-CPS-S2Sv2: Beijing Climate Center (BCC) Climate Prediction System version 2 for S2S.

Independent Variables (Grids)

Lead (forecast_period)
grid: /L1 (days) ordered (1.0 days) to (60.0 days) by 1.0 N= 60 pts :grid
Ensemble Member (realization)
grid: /M (ids) ordered (1) to (3) by 1.0 N= 3 pts :grid
forecast start time (forecast_reference_time)
grid: /S (days since 1960-01-01) ordered (0000 11 Nov 2019) to (0000 19 May 2025) by 1.0 N= 2017 pts :grid
longitude (longitude)
grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
latitude (latitude)
grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid

Other Info

bufferwordsize
4
datatype
realarraytype
gribPDSpattern
04XXXX000B0134
missing_value
9.99900026E20
pointwidth
0.0
standard_name
precipitation_amount
units
kg m-2
standard units*
kilogram meter-2

Last updated: Wed, 21 May 2025 12:11:07 GMT

Data Views

L1MSXY
[ X Y | M L1 S]MMMMM