hdate | grid: /hdate (months since 1960-01-01) ordered (1995) to (2017) by 12.0 N= 23 pts :grid
|
Lead (forecast_period) | grid: /LA (days) ordered (0.5 days) to (31.5 days) by 1.0 N= 32 pts :grid
|
Ensemble Member (realization) | grid: /M (ids) ordered (1) to (3) by 1.0 N= 3 pts :grid
|
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered (0000 7 Jan 2016) to (0000 6 Jun 2024) by 7.0 N= 440 pts :grid
|
longitude (longitude) | grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
|
latitude (latitude) | grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid
|