ECMWF S2S ECCC reforecast perturbed pressure_level_1 q: Specific Humidity data

reforecast perturbed pressure_level_1 Specific Humidity from ECMWF S2S ECCC: ECCC Ensemble Prediction System.

Independent Variables (Grids)

hdate
grid: /hdate (months since 1960-01-01) ordered (1995) to (2017) by 12.0 N= 23 pts :grid
Lead (forecast_period)
grid: /L1 (days) ordered (1.0 days) to (32.0 days) by 1.0 N= 32 pts :grid
Ensemble Member (realization)
grid: /M (ids) ordered (1) to (3) by 1.0 N= 3 pts :grid
Pressure Level (air_pressure)
grid: /P2 (hPa) ordered [ (200) (300) (500) (700) (850) (925) (1000)] :grid
forecast start time (forecast_reference_time)
grid: /S (days since 1960-01-01) ordered (0000 7 Jan 2016) to (0000 6 Jun 2024) by 7.0 N= 440 pts :grid
longitude (longitude)
grid: /X (degree_east) periodic (0) to (1.5W) by 1.5 N= 240 pts :grid
latitude (latitude)
grid: /Y (degree_north) ordered (90N) to (90S) by 1.5 N= 121 pts :grid

Other Info

bufferwordsize
4
datatype
realarraytype
gribPDSpattern
04XXXX003C0100
missing_value
9.99900026E20
pointwidth
0.0
standard_name
specific_humidity
units
kg /kg
standard units*

Last updated: Fri, 12 Jul 2024 16:19:57 GMT

Data Views

hdateL1MP2SXY
[ X Y | P2 M L1 S hdate]MMMMMMM