outline | an outline showing all sub-datasets and variables contained in this dataset |
Lead (forecast_period) | grid: /L (days) ordered (1.0 days) to (31.0 days) by 1.0 N= 31 pts :grid |
forecast start time (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered (0000 4 Jan 2016) to (0000 29 May 2025) by 1.0 N= 3434 pts :grid |
Last updated: Tue, 27 Feb 2024 13:45:08 GMT
Expires: Sat, 02 Aug 2025 00:00:00 GMT